In December 2022 we created our site entrance.Click hereWe had our first site meeting and it was cold!!! Josh turned up in a shirt OMG it made me feel even colder than I was feeling. January in just a shirt.Click here We started building the site compound in January 2023.Click here The main site security fencing is now going in place and work on the community centre has started. Click here Giving some of our subsoil to Easton College Click here Creating the main soakaway using crates Click here Fitting the Rain Water Harvesting Tank Click here Steel Frame arrives on site Click here Getting the pad ready for the pour Click here Steels in to reinforce the slab Click here Preparing the main drain chamber Click here Underground services for the EV chargers Click here Creating the internal wall plates Click here The internal walls are going up Click here The roof goes on the main hall Click here More work to the roof Click here Adding guttering Click here Adding the solar trays Click here Preparing for the Hardy Plank cladding Click here Fitting the external doors Click here Main hall prep work Click here Scaffolding removed Click here Fire Curtain Installed Click here Getting ready to lay the pathways Click here Laying the pathways Click here Preparing for floor screed second pour Click here Laying the rear courtyard Click here Painting starts Click here Main Drain goes in Click here Creating the footpath at the front Click here Whiterock goes up in the kitchen and bar area Click here Door trims get added Click here External door plates are installed click here Down pipes go on here Breaking Ground Ceremony Click here Preparing for the foundations Click here Foundations being poured Click here Kerbing the car park Click here Preparing for temporary water supply Click here Tarmac layer added to carpark Click here Foul water services Click here Pouring the slab in one day and it was a hot one. the guys worked non-stop to achieve a single pour Click here Preparing the building for scaffolding Click here Creading the remaining car park Click here Laying tarmac on the remaining car park Click here The truss roof goes on the rest of the building Click here The windows and vents go in the roof Click here Preparimg for the metal seamed roof Click here Fitting the metal seamed roof Click here Fitting the Hardy Plank cladding Click here First fix plumbing Click here Preparing to screed the floor Click here remaining brickwork is finished Click here Air Circulation Terminals Installed Click here Lightning Protection Click here The Electric Room Click here External Lighting gets installed Click here Installing underfloor heating part 2 Click here Preparing the car park for blocks Click here Whiterock goes up in the toilets and changing room Click here Flooring Preparation underway Click here Pump Room Click here Carpark blocks go down Click here Toilets and changing rooms get kitted out Click here Rear service path created Click here Bike store and Bin store installed Click here The site strip has started Click here Preparing the site for underground services Click here Creating the Pad Click here Preparing for temporary electrical supply Click here The steel frame is going up Click here The lower face bricks are laid Click here The slab is complete and will harden over the next seven days Click here Underground BT services go in Click here Scaffolding goes up thanks to Tubes Click here The wall panels arrive Click here The wall panels start going up (fast) Click here Preparing for the roof to go on Click here First look inside the main hall with the roof on Click here The drain covers are created for the car park Click here Creating the battens layout for the solar panels Click here Adding the solar panels Click here Fitting the windows Click here First fix electrical Click here Scaffolding comes down Click here External ground works continue Click here Plaster Board Goes on Click here Plaster Goes on Click here Adding electricals to the offices Click here Add walkway in loft Click here More areas covered with plasterboard Click here Ariel images March 2024 Click here Acoustic panels go up in the main hall Click here General Internal images Click here LVT flooring goes down Click here Bike store and Bin store installed Click here Internal doors are hung Click here